Site icon Peter Butler on Money Making Garden & Landscaping Websites

In Stage 16 we’re ready to do the lazer level bit so it all sits level

The water bed frame is constructed and ‘in situ’. I’m ready to use the lazer level to set all the heights and levels in our water bed and pool to pond.

The second liner layer is in and bonded to the pool. The pool has had it’s second coat of sealer.

httpv://www.youtube.com/watch?v=J6W2fDYa94k

 

 

 

 

Exit mobile version