Stage 49

March 24, 2010 by  
Filed under Aquaponics & Permaculture

Stage 48

March 24, 2010 by  
Filed under Aquaponics & Permaculture

Stage 47

March 24, 2010 by  
Filed under Aquaponics & Permaculture

Stage 46

March 24, 2010 by  
Filed under Aquaponics & Permaculture

Stage 45

March 24, 2010 by  
Filed under Aquaponics & Permaculture

Stage 22 – Final plumbing tweaking

August 26, 2009 by  
Filed under Aquaponics & Permaculture

Final plumbing tweaking and the water flow before the final top up.

The Water is in and we’re almost ready for fish and plants – Stage 21

August 4, 2009 by  
Filed under Aquaponics & Permaculture

The water is in and we’re almost ready for the fish and plants.


The mechanics of setting the levels using a lazer level – Stage 17

July 19, 2009 by  
Filed under Aquaponics & Permaculture

The mechanics of setting the levels using a lazer level showing the height pegs in each corner

In Stage 16 we’re ready to do the lazer level bit so it all sits level

July 19, 2009 by  
Filed under Aquaponics & Permaculture

The water bed frame is constructed and ‘in situ’. I’m ready to use the lazer level to set all the heights and levels in our water bed and pool to pond.

The second liner layer is in and bonded to the pool. The pool has had it’s second coat of sealer.





The Water Bed Frame and “We’ve Sprung a Leak” – Damn- Stage 15

July 19, 2009 by  
Filed under Aquaponics & Permaculture

The water bed frame is in and we’ve had to put in a second layer of the pool liner becasue we sprung a leak, damn…

Next Page »