Month: July 2009

The sand is all in the pool to pond conversion

The sand is all in, yippee! OMG, that was 37 m3 of dirt, made up of 25 cubic metres of […]

Another Step in the Pool to Pond – Stage 10

Ready after the Bobcat for all the backfill to go in behind the false wall. httpv://www.youtube.com/watch?v=6MnEn1Ntho8

Stage 9 and We Have Water in the Pool to Pond

We finally have some water (a bit) in the pool to pond conversion.The solid wall is in, so is the […]

Peter Butler’s Pool to Pond Stage 8

The liner is in and sealed, the pool sides have just been painted and curing. httpv://www.youtube.com/watch?v=XEqOk7B2_Pk

Scroll to Top
Call Now Button